IMG_8318

Mechanical and Electrical On-Site Services

Our work includes installing new ventilation equipment, lighting systems, telephones, CCTV systems, access systems and escape routes, emergency signage and tunnel closure systems before considering automation and engineering consultancy surveys.

To enable the systems upgrade the tunnels were being stripped back to their bare structure to enable a range of civil engineering works and structural repairs to be undertaken both within the tunnels and a number of existing live plant rooms.

Seeing a key part of the automated baggage handling system up and running makes me feel a lot better. Name one other construction project in the UK costing over £1bn that is on time and on budget.

– Tony Douglas

JCK has total capability in the construction and refurbishment of the infrastructure of civil & commercial aviation. We have an in-depth understanding of the security and logistical implications of air-side and restricted zone working.

With access to the specialist expertise, additional resources and experience from within our wider Service Partner Group, we have the solutions to suit your individual project needs.

Notable Case Study

T4 Heathrow Lighting Systems

IMG_8459 (1)

See Case Study